The Rex Barn restoration project.
The Rex Barn
Roof coming off
First roof deck on. Walls not repointed yet.
Rafter and collar tie joinery.
Coppola on.
Beginning of the metal roof east side.
Arch rubble removed.
Arch transom fabrication.
Exterior lighting installed.
Beginning of the bathroom building.
Installing the Coppola
Second floor concrete coating.
Installing the ridge beam.
Rubble removed. Bracing installed.
Ridge beam.
Hay vent restored.
Removing roof rafters. Packer Mansion through vent window.
Installing new internal frame.
Heating up to re-emulsify second coat.
Weld down deck before the concrete.
Original roof deck being cleaned up for reinstallation for ceiling finish.
Beginnings of the ICF (insulated concrete form) bathroom building.